Carpet laying engineering construction standard
- Aug 10, 2018 -

1. The interior must be completed before the carpet is laid. All heavy equipment in the room has been in place and has been commissioned, operated, and verified to meet the eligibility criteria.
2. After entering the site, carpets, liners and adhesives should be checked to check whether the quantity, variety, specifications, colors, patterns, etc. meet the design requirements. If they meet the requirements, they should be stored in a dry warehouse or room according to their varieties and specifications. Pre-laying, flowering, and numbering are required before use.
3. Laying the base layer of the floor carpet, the surface is required to be smooth, smooth and clean. If there is oil, it must be cleaned with acetone or turpentine. If it is a cement floor, it should have a certain strength and the water content is not more than 8%.